Container Terminal
STS 23 Row — Joint stress analysis
- Client
- MGM OMG
- Location
- La Spezia (SP)
- Year
- 2014
- Type
- Ship-to-shore crane
- Verification
- Welded-connection fatigue
The STS 23 Row crane of the La Spezia Container Terminal, in transit on a barge toward the quay, escorted by two tugboats.
The trolley runs beneath the main girder, between the two legs of the portal: this is where the heaviest load cycles on the welded connections are concentrated.
SPC S.r.l. provided design support for a ship-to-shore (STS) crane at the La Spezia Container Terminal, carrying out the stress analysis of the welded connection joints across the various structural members: local models were analyzed within the context of the global FEM model, with fatigue verification of the critical welded connections.