Skip to content
Back to projects

Art Museum — Louvre Abu Dhabi

Seismic components for the raised access floor

Art Museum — Louvre Abu Dhabi — Seismic components for the raised access floor
Client
Nesite — Transpack Group Service S.p.A.
Location
Abu Dhabi (EAU)
Year
2015–2016
Floor elevation
60 cm
Bracing profiles
50×50×3 mm
The space beneath the perforated dome: the “rain of light” over the white pavilion volumes.
Dimensioned detail of the raised-floor bracing system, “Panels + BPC stringers” case.

The Louvre Abu Dhabi, a museum of art and civilization on Saadiyat Island, opened on November 8, 2017. It covers roughly 24,000 sq. m. and is considered one of the world's most prestigious universal museums.

SPC S.r.l. was commissioned by Nesite - Transpack Group Service S.p.A. to design and verify the seismic components of the raised access floor in the exhibition pavilions (the Galleries): a floor system raised about 60 cm above the slab, housing the museum's entire services network. The system relies on two types of bracing, K-bracing and V-bracing, arranged along two independent directions — longitudinal and transverse — to transfer seismic forces from the runners to the floor slab; blocking elements are added for the floor panels and, separately, spacers for the longitudinal cross-members, along with connections between the transverse runners sized for the corresponding tension and compression actions.

An exhibition Gallery, open to the public: the walking surface is the raised access floor covered by this assignment.

Let's talk about your project

Whether it's refining a detailed design, shaping a concept, or solving a technical issue, your need is our starting point.

Get in touch