New SS9 “Via Emilia” Bridge over the Po

Launch analysis and structural sizing of the equipment

New SS9 “Via Emilia” Bridge over the Po — Piacenza — Launch analysis and structural sizing of the equipment
Client
ANAS S.p.A.
Contractor
SPIC S.r.l.
Location
Piacenza — SS9 Emilia
Year
2010
Bridge length
814 m
Reopened
11/18/2010
The deck seen from below: the orthotropic plate and the rib framing.
The hydraulic jacks and sliding units that push the girder.
The girder arriving at the pier, with the bearing saddle.

On April 30, 2009, an exceptional flood caused the collapse of a span of the old bridge over the Po along the Via Emilia in Piacenza, built in 1908 and rebuilt after the war. ANAS subsequently built the new bridge, reopened to traffic on November 18, 2010: a steel truss girder with an orthotropic-plate deck, resting on the existing masonry piers and new reinforced-concrete piers.

SPC S.r.l. supported SPIC S.r.l. in designing the launching equipment — nose, tail, and roller units — for the incremental launch of the girder, pushed by winches along parallel assembly lines from the launch yard on the left floodplain. The work covered the analysis of the structural response during erection and launch, the sizing of the nose and tail (a twin 38 m truss, with jack-based camber recovery) and of the roller units, as well as local checks of the bottom chords in transit and FEM stress analysis of the bridge-to-nose joints. Of particular complexity was the numerical analysis, carried out under nonlinear, staged-construction conditions, of how the deck's counter-camber affected the distribution of the support reactions during launch.

Local checks of the bottom chords were also carried out as they passed over the roller units during launch. Local FEM stress analyses were performed on the bridge-to-nose interface joints, along with an analysis of the camber-recovery scenarios and the interaction with the tilting saddle at the arriving pier, using nonlinear staged FEM analysis.

A roller unit under the bottom chord, during the girder's transit.
The launched truss girder, seen from the floodplain.