S.P. 34 Upgrade
Static and administrative-technical acceptance testing
- Client
- Provincia di Vicenza
- Location
- Altavilla Vicentina (VI)
- Year
- 2025 — ongoing
- Phase
- 3rd phase, 1st lot
- Construction technique
- Mechanically stabilized earth
SPC's work covered the examination and verification of documentation confirming that the completed works comply with applicable regulations, standard practice, and the design and contract requirements; verification of the final accounts against supporting documents and the completed works; and a series of site visits, with support from the Works Supervisor, to verify correct execution.
The site visits followed the construction of the new interchange and the road embankments, between the overpass and the neighboring industrial premises.
Among the tools supporting the acceptance testing, a drone survey produced a photogrammetric model of the entire area, useful for verifying the geometry and volumes of the completed works.
The same output, colored by elevation, made it possible to check the volumes of the mechanically stabilized earth embankments against the design.