Serio Viaduct (A35)
Launching equipment design
- Client
- Brebemi S.p.A.
- Contractor
- SPIC S.r.l.
- Location
- Autostrada A35 Brebemi, tratto Brescia-Milano (BS-MI)
- Year
- 2009
- Segment weight
- 900 kN
- Maximum width
- 2,680 mm
The crossing of the Serio River along the A35 Brebemi motorway (Brescia-Milan) is built with a new viaduct made of precast prestressed-concrete box-girder segments, assembled with post-tensioned cables. The deck is erected using a self-launching steel gantry that, positioned on the road embankment on the Brescia side, advances over the piers span by span.
SPC S.r.l., on behalf of SPIC S.r.l., directed the sizing and structural verification of the launching equipment: the main girder, made of three-dimensional lattice trusses, the support structures — roller units, front and rear pendulum legs — and the main and auxiliary winches. The design followed the F.E.M. 1.001 standard “Rules for the design of hoisting appliances,” specific to lifting equipment.