Skip to content
Back to projects

Serio Viaduct (A35)

Launching equipment design

Serio Viaduct (A35) — Launching equipment design
Client
Brebemi S.p.A.
Contractor
SPIC S.r.l.
Location
Autostrada A35 Brebemi, tratto Brescia-Milano (BS-MI)
Year
2009
Segment weight
900 kN
Maximum width
2,680 mm
The self-launching gantry resting on the piers, advancing along the viaduct.
A precast segment suspended beneath the girder, awaiting placement.

The crossing of the Serio River along the A35 Brebemi motorway (Brescia-Milan) is built with a new viaduct made of precast prestressed-concrete box-girder segments, assembled with post-tensioned cables. The deck is erected using a self-launching steel gantry that, positioned on the road embankment on the Brescia side, advances over the piers span by span.

SPC S.r.l., on behalf of SPIC S.r.l., directed the sizing and structural verification of the launching equipment: the main girder, made of three-dimensional lattice trusses, the support structures — roller units, front and rear pendulum legs — and the main and auxiliary winches. The design followed the F.E.M. 1.001 standard “Rules for the design of hoisting appliances,” specific to lifting equipment.

The front pendulum leg and the lattice trusses of the main girder.
The segment's box cross-section seen from below, showing the webs and bottom slab.

Let's talk about your project

Whether it's refining a detailed design, shaping a concept, or solving a technical issue, your need is our starting point.

Get in touch